top of page

T-228 Hammer Field Exercise Building

Richland, WA

Fowler was awarded this project in 2011 by customer Mission Support Alliance (MSA).

Construction of a new pre-engineered metal building approximately 16,800 sq/ft in size. Located at HAMMER’s campus, the Field Exercise building is a single-story building with ample area for hands-on training, drive through portal monitors, and a large loading dock with staged trailers. The building includes storage areas, restrooms, bleachers, and state of the art audio and visual technical equipment.

Type:

Size:

Cost:

Client:

Architect:

Start Date:

Completion:

New Construction

16,800 sq/ft

$1,944,000

Mission Support Alliance, LLC

Design West Architects

3/26/2015

7/20/2016

Apollo tank farm pump pull.png
White%20Web%20Header_edited.png

Copyright 2024 - 2025, Fowler General Construction, Inc.

All rights reserved.

  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
  • Google Play
bottom of page